Crawley · West Sussex · Est. 2018
Road planings,
asphalt & muck away haulage
We keep surfacing and civils contractors moving across Sussex, Surrey and the M23/M25 corridor — 8-wheel tippers, thermal asphalt bodies, and the transfer documentation done properly on every load.
- Licence
- Upper tier CBDU484358
- Vehicles
- 8×4 tippers & thermal bodies
- Response
- Quotes back in 30 minutes
- Paperwork
- Transfer notes & weighbridge tickets
Licensed & registered
- Environment Agency waste carrier CBDU484358
- Registered in England 11522190
- Goods in Transit & Public Liability insured
- FORS — in progress
- Constructionline — in progress
What we do
Six things we move, every day
Sub-contract tipper haulage for surfacing contractors, groundworkers and civils firms. Per load, per day, or on contract mileage.
Flagship
Road planings — removal & haulage
Planings taken straight off the milling machine and away from the lane. Continuous shuttle on resurfacing campaigns, day or night.
Flagship
Asphalt haulage
Insulated thermal bodies keeping material at temperature from plant to paver. Night works and early starts are normal for us, not an exception.
Muck away & site clearance
Inert soils, hardcore and site arisings cleared to licensed facilities, with a transfer note and a weighbridge ticket back for every load.
Breakout & concrete
Broken-out slab, kerb, concrete and hardcore removed from site and routed to a recycling facility rather than landfill wherever the material allows.
Aggregate supply & delivery
Type 1, recycled planings, hardcore and sub-base delivered to site by the load. Back-haul pricing when we are already clearing from you.
Bulk tipper haulage
Trucks on hire by the day or on contract mileage for longer programmes — with day work and waiting time agreed up front, never after the fact.
Registered at Companies House in August 2018 and working the South East ever since.
Four-axle rigids carrying roughly 20 tonnes of payload per load.
Send a postcode and a material and you get a number back, not a callback form.
Conveyance and transfer note on every job, weighbridge ticket where the tip issues one.
Duty of care
Materials we're licensed to carry
Every load leaves site with a conveyance and transfer note quoting the correct European Waste Catalogue code. If your material isn't listed, ask — most of the time we can take it.
| EWC code | Material | Classification | Typical job |
|---|---|---|---|
| 17 03 02 | Bituminous mixtures — road planings, reclaimed asphalt | Non-hazardous | Resurfacing, planing campaigns, car park overlays |
| 17 03 01 | Bituminous mixtures containing coal tar | Hazardous | Older carriageway build-ups — tested and routed separately |
| 17 05 04 | Soil and stones | Inert | Muck away, bulk dig, footings and drainage arisings |
| 17 01 01 | Concrete | Inert | Slab and kerb breakout, hardstanding removal |
| 17 01 07 | Mixed concrete, brick, tile and ceramic | Inert | Demolition arisings and general site clearance |
| 17 09 04 | Mixed construction and demolition waste | Non-hazardous | Strip-out and refurbishment loads |
“I confirm that I have fulfilled my duty to apply the waste hierarchy, as required by Regulation 12 of the Waste (England and Wales) Regulations 2011.” — printed on every Naidu & Co conveyance note.
The fleet
Trucks that turn up
A programme falls apart when the wagons don't arrive. Ours are maintained on a planned schedule and driven by the same faces your site team will see week after week.
- 8×4 rigid tippers — roughly 20 tonnes of payload, sheeted and weighed on every load.
- Insulated thermal bodies — asphalt arrives at laying temperature, not tepid.
- Night and weekend working — road closures and possessions are routine for us.
- Direct line to the yard — no call centre between you and the person moving the trucks.
Who we work for
Built around four kinds of customer
We are the haulage half of somebody else's contract. That shapes how we quote, how we plan and how fast we answer the phone.
Surfacing contractors
Planings off, asphalt on. Continuous shuttle so the paver never waits.
Civils & groundworks
Bulk dig, footings and drainage arisings cleared to programme.
Highways & councils
Night closures, coal-tar segregation and full audit paperwork.
Demolition
Concrete, brick and mixed arisings routed to recycling first.
Where we work
Sussex, Surrey and the M23/M25 corridor
We are based at Blackfold Road in Crawley — minutes from the M23 and inside half an hour of Gatwick, Horsham, Redhill and East Grinstead. Longer runs into London and the wider South East are quoted on the day.
Planings gone before the milling machine caught up, and the transfer notes in my inbox the same afternoon. That is the whole job.Client testimonial — to be supplied
Need trucks this week?
Send us a postcode, the material and how many loads. You'll get an indicative price back within half an hour — or just ring the yard and speak to someone now.